{"id":126,"date":"2025-10-24T12:52:27","date_gmt":"2025-10-24T11:52:27","guid":{"rendered":"https:\/\/makeinsalford.com\/wiki2\/?p=126"},"modified":"2026-01-20T15:45:39","modified_gmt":"2026-01-20T15:45:39","slug":"turning-on-the-haas-umc-500-mill","status":"publish","type":"post","link":"https:\/\/makeinsalford.com\/wiki\/cnc-machining\/haas-umc-500-mill-cnc-machining\/126\/turning-on-the-haas-umc-500-mill\/","title":{"rendered":"Turning on the Haas UMC-500 mill"},"content":{"rendered":"<div class=\"hpb-block-front\"><h2 class=\"hpb-heading\">Hazards<\/h2><div class=\"hpb-item\"><img decoding=\"async\" src=\"https:\/\/makeinsalford.com\/wiki\/wp-content\/plugins\/hazard-ppe-pictogram-block-v1.7.4\/assets\/pictograms\/ppe-safety-glasses.png\" class=\"hpb-icon\" alt=\"PPE required: Safety Glasses\" \/><div class=\"hpb-text\"><div class=\"hpb-title\">Safety Glasses<\/div><div class=\"hpb-desc\">Safety Glasses must be worn while working in the Morson Engine Room.<\/div><\/div><\/div><div class=\"hpb-item\"><img decoding=\"async\" src=\"https:\/\/makeinsalford.com\/wiki\/wp-content\/plugins\/hazard-ppe-pictogram-block-v1.7.4\/assets\/pictograms\/crush.png\" class=\"hpb-icon\" alt=\"Crush hazard pictogram\" \/><div class=\"hpb-text\"><div class=\"hpb-title\">Crush Hazard<\/div><div class=\"hpb-desc\">There is a risk of crushing injury from moving parts in this machine. Keep doors and windows to the enclosure closed when the machine is running. Do not defeat safety interlocks.<\/div><\/div><\/div><\/div>\n\n\n<h2 class=\"wp-block-heading\">Instructions<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">It&#8217;s important to follow the power-on and warm up process to avoid easily preventable damage to the spindle bearings. As the machine sits unused any oil lubricant in the bearings settles to the bottom &#8211; the spindle warmup program will gently warm up the bearings and distribute this oil back around as needed. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">You need to run the warmup program if the machine has been sitting unused for more than 24 hours. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If the machine has been sat for longer than 1-2 weeks (such as after the Christmas holidays) a longer warmup cycle is required &#8211; ask a member of technical staff for assistance with this. <\/p>\n\n\n\n<div class=\"wp-block-media-text is-stacked-on-mobile\"><figure class=\"wp-block-media-text__media\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"1024\" src=\"https:\/\/makeinsalford.com\/wiki\/wp-content\/uploads\/2025\/10\/haas-umc-500-power-buttons-1024x1024.jpg\" alt=\"\" class=\"wp-image-134 size-full\" srcset=\"https:\/\/makeinsalford.com\/wiki\/wp-content\/uploads\/2025\/10\/haas-umc-500-power-buttons-1024x1024.jpg 1024w, https:\/\/makeinsalford.com\/wiki\/wp-content\/uploads\/2025\/10\/haas-umc-500-power-buttons-300x300.jpg 300w, https:\/\/makeinsalford.com\/wiki\/wp-content\/uploads\/2025\/10\/haas-umc-500-power-buttons-150x150.jpg 150w, https:\/\/makeinsalford.com\/wiki\/wp-content\/uploads\/2025\/10\/haas-umc-500-power-buttons-768x768.jpg 768w, https:\/\/makeinsalford.com\/wiki\/wp-content\/uploads\/2025\/10\/haas-umc-500-power-buttons.jpg 1512w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure><div class=\"wp-block-media-text__content\">\n<p class=\"wp-block-paragraph\">Press the green<strong> Power On<\/strong> button and wait for the control to start up.<\/p>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-media-text is-stacked-on-mobile\"><figure class=\"wp-block-media-text__media\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/makeinsalford.com\/wiki\/wp-content\/uploads\/2025\/10\/snapshot2.png\" alt=\"\" class=\"wp-image-127 size-full\" srcset=\"https:\/\/makeinsalford.com\/wiki\/wp-content\/uploads\/2025\/10\/snapshot2.png 1024w, https:\/\/makeinsalford.com\/wiki\/wp-content\/uploads\/2025\/10\/snapshot2-300x225.png 300w, https:\/\/makeinsalford.com\/wiki\/wp-content\/uploads\/2025\/10\/snapshot2-768x576.png 768w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure><div class=\"wp-block-media-text__content\">\n<p class=\"wp-block-paragraph\">Once the machine has booted up you will be presented with the &#8220;Haas Start Up&#8221; screen. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Follow the instructions on the right hand side &#8211; open and close the door, reset the E-Stop button, and press <strong>Power Up<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Wait for the machine to home itself. Keep in mind all the axes of the machine will move themselves, so if you think there is risk of a collision ask a member of technical staff for help before starting. <\/p>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-media-text is-stacked-on-mobile\"><figure class=\"wp-block-media-text__media\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/makeinsalford.com\/wiki\/wp-content\/uploads\/2025\/10\/snapshot3.png\" alt=\"\" class=\"wp-image-128 size-full\" srcset=\"https:\/\/makeinsalford.com\/wiki\/wp-content\/uploads\/2025\/10\/snapshot3.png 1024w, https:\/\/makeinsalford.com\/wiki\/wp-content\/uploads\/2025\/10\/snapshot3-300x225.png 300w, https:\/\/makeinsalford.com\/wiki\/wp-content\/uploads\/2025\/10\/snapshot3-768x576.png 768w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure><div class=\"wp-block-media-text__content\">\n<p class=\"wp-block-paragraph\">Once you have green ticks next to the top three items, press the <strong>Cancel <\/strong>button to leave this screen.<\/p>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-media-text is-stacked-on-mobile\"><figure class=\"wp-block-media-text__media\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/makeinsalford.com\/wiki\/wp-content\/uploads\/2025\/10\/snapshot4.png\" alt=\"\" class=\"wp-image-129 size-full\" srcset=\"https:\/\/makeinsalford.com\/wiki\/wp-content\/uploads\/2025\/10\/snapshot4.png 1024w, https:\/\/makeinsalford.com\/wiki\/wp-content\/uploads\/2025\/10\/snapshot4-300x225.png 300w, https:\/\/makeinsalford.com\/wiki\/wp-content\/uploads\/2025\/10\/snapshot4-768x576.png 768w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure><div class=\"wp-block-media-text__content\">\n<p class=\"wp-block-paragraph\">Press the <strong>List Program<\/strong> button and navigate to the <strong>Memory <\/strong>tab using the <strong>Cursor <\/strong>buttons. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Highlight the program &#8220;UMC-500 15k Spindle Warmup&#8221; as shown, and press <strong>Select Program<\/strong> to load it into the active memory.<\/p>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-media-text is-stacked-on-mobile\"><figure class=\"wp-block-media-text__media\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/makeinsalford.com\/wiki\/wp-content\/uploads\/2025\/10\/snapshot5.png\" alt=\"\" class=\"wp-image-130 size-full\" srcset=\"https:\/\/makeinsalford.com\/wiki\/wp-content\/uploads\/2025\/10\/snapshot5.png 1024w, https:\/\/makeinsalford.com\/wiki\/wp-content\/uploads\/2025\/10\/snapshot5-300x225.png 300w, https:\/\/makeinsalford.com\/wiki\/wp-content\/uploads\/2025\/10\/snapshot5-768x576.png 768w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure><div class=\"wp-block-media-text__content\">\n<p class=\"wp-block-paragraph\">Press the <strong>Memory <\/strong>button to switch into memory mode, and then press <strong>Cycle Start <\/strong>to start running the warmup program.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">You may wish to run the coolant during the warmup process, to do so press the <strong>Coolant <\/strong>button.<\/p>\n<\/div><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">Once the warmup program has finished running the machine is ready to be used. <\/p>\n","protected":false},"excerpt":{"rendered":"<p>Instructions It&#8217;s important to follow the power-on and warm up process to avoid easily preventable damage to the spindle bearings. As the machine sits unused any oil lubricant in the bearings settles to the bottom &#8211; the spindle warmup program will gently warm up the bearings and distribute this oil back around as needed. You [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[12],"tags":[15,62,64,66,67],"class_list":["post-126","post","type-post","status-publish","format-standard","hentry","category-haas-umc-500-mill-cnc-machining","tag-cnc","tag-haas","tag-mill","tag-power-up-2","tag-warmup"],"_links":{"self":[{"href":"https:\/\/makeinsalford.com\/wiki\/wp-json\/wp\/v2\/posts\/126","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/makeinsalford.com\/wiki\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/makeinsalford.com\/wiki\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/makeinsalford.com\/wiki\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/makeinsalford.com\/wiki\/wp-json\/wp\/v2\/comments?post=126"}],"version-history":[{"count":7,"href":"https:\/\/makeinsalford.com\/wiki\/wp-json\/wp\/v2\/posts\/126\/revisions"}],"predecessor-version":[{"id":305,"href":"https:\/\/makeinsalford.com\/wiki\/wp-json\/wp\/v2\/posts\/126\/revisions\/305"}],"wp:attachment":[{"href":"https:\/\/makeinsalford.com\/wiki\/wp-json\/wp\/v2\/media?parent=126"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/makeinsalford.com\/wiki\/wp-json\/wp\/v2\/categories?post=126"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/makeinsalford.com\/wiki\/wp-json\/wp\/v2\/tags?post=126"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}